SL. No. Scope of work Work Order No. & Date Location of Project
01 ETC of Electrical HT Package BHE/PW/PUR/WNT2-ELE/1710/LOI, Dt.06.04.2017 UNIT # 8 1x800MW Wanakbori TPS
02 ETC of Electrical LT Package BHE/PW/PUR/WNT2-CBL/1668/LOI, Dt.03.02.2017 UNIT # 8 1x800MW Wanakbori TPS
03 ETC of Construction Power Supply Package BHEL/PSSR/SCT/1650,2017/308, Dt. 26.07.2017
2 X 800 MW Uppur TPP
04 ETC of 400KV Switchyard Package TBSM/BHADRADRI (MANUGURU)/ETC/LOI/27/17-18, Dt.06.01.2018
400KV Switch yard at 4X270 MW BTPS, Manuguru
05 SETC of 400/220/132KV GIS Substation Package TBSM/SHAMLI /ETC /LOI /40/19-20, DATE: 14.01.2020
400/220/132KV GIS Substation at Shamli in Uttar Pradesh
06 ETC of Electrical HT & LT Package BHE/PW/PUR/ MANUT-ELE/U#3&4/1822/LOA/3444616,Dt.07-02-2018
Unit#3 & 4, 4X270MW BTPS, Manuguru, Telengana
07 SETC of 765/400kV Switchyard Package TBSM/MEDINIPUR/ETC/LOI/30/18-19, Dt.24.01.2019
765/400kV 1 X 525MW Tuticorin TPS Stage IV, MEIL, Tamilnadu
08 ETC of Electrical and C&I Package BHEL/PSSR/SCT/1768,2019/0054, Dt. 21.01.2019
1 X 525MW Tuticorin TPS Stage IV, MEIL, Tamilnadu